{"id":4612,"date":"2014-07-23T11:12:10","date_gmt":"2014-07-23T09:12:10","guid":{"rendered":"https:\/\/www.eranove.com\/amenagement-du-cavally-appel-a-manifestation-dinteret\/"},"modified":"2021-05-14T11:31:57","modified_gmt":"2021-05-14T09:31:57","slug":"amenagement-du-cavally-appel-a-manifestation-dinteret","status":"publish","type":"post","link":"https:\/\/www.eranove.com\/en\/blog\/2014\/07\/23\/amenagement-du-cavally-appel-a-manifestation-dinteret\/","title":{"rendered":"Am\u00e9nagement du Cavally &#8211; Appel \u00e0 Manifestation d&#8217;Int\u00e9r\u00eat"},"content":{"rendered":"<p><!--:fr--><\/p>\n<p class=\"lead\">AVIS D\u2019APPEL A MANIFESTATION D\u2019INTERET<br \/>\nEtudes d\u2019\u00e9valuation de Projet (APS \u2013 IES \u2013 BP \u2013 APD)<\/p>\n<p><span style=\"font-size: 10pt;\">La C\u00f4te d\u2019Ivoire a retrouv\u00e9 sa place parmi les pays assurant le leadership \u00e9conomique de la r\u00e9gion CEDEAO (Communaut\u00e9 Economique des Etats de l\u2019Afrique de l\u2019Ouest). L\u2019apaisement politique et la croissance \u00e9conomique, qui fr\u00f4le les 10% depuis 2012 ont entrain\u00e9 un retour des investisseurs plus nombreux qu\u2019autrefois et une augmentation de la demande d\u2019\u00e9lectricit\u00e9 (plus de 15%).<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">De plus les autorit\u00e9s Ivoiriennes affichent leur volont\u00e9 de faire de la C\u00f4te d\u2019Ivoire un pays autosuffisant en \u00e9lectricit\u00e9 et exportateur net, devenant ainsi un acteur cl\u00e9 du futur r\u00e9seau r\u00e9gional de l\u2019\u00e9lectricit\u00e9. Dans cet objectif, La C\u00f4te d\u2019Ivoire, a entrepris de d\u00e9velopper son potentiel hydro\u00e9lectrique. C\u2019est ainsi donc que le 19 Mars 2014, la C\u00f4te d\u2019Ivoire et le groupe eranove ont sign\u00e9 un protocole d\u2019accord (\u00ab le Protocole d\u2019Accord \u00bb) pour la conception, le financement, la construction et l\u2019exploitation de deux am\u00e9nagements hydro\u00e9lectriques des sites de Tiboto et Tahibli (\u00ab le Projet \u00bb) sur le fleuve Cavally dans le cadre d\u2019un contrat de type BOO (Build Own Operate).<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Le groupe eranove dont l\u2019actionnaire majoritaire est ECP (Emerging Capital Partners), est un acteur majeur de la gestion des services publics et de la production d\u2019\u00e9lectricit\u00e9 en Afrique de l\u2019Ouest. Le groupe eranove exploite au travers de ses filiales, un parc de production d\u2019\u00e9lectricit\u00e9 de 604 MW de centrales hydro\u00e9lectriques et de 532 MW de centrales thermiques dont 432 MW par sa filiale CIPREL (Compagnie Ivoirienne de Production d\u2019Electricit\u00e9) qui est le premier producteur priv\u00e9 d\u2019\u00e9lectricit\u00e9 (IPP) en C\u00f4te d\u2019Ivoire.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Avec la signature du Protocole d\u2019Accord, le groupe eranove souhaite augmenter son parc de production hydro\u00e9lectrique en y int\u00e9grant l\u2019am\u00e9nagement hydro\u00e9lectrique de Tiboto dont la capacit\u00e9 est estim\u00e9e \u00e0 225 MW et celui de Tahibli dont la capacit\u00e9 est estim\u00e9e \u00e0 19,5 MW. Les deux sites se trouvent sur le fleuve Cavally \u00e0 l\u2019ouest de la C\u00f4te d\u2019Ivoire. Le groupe eranove s\u2019est engag\u00e9 \u00e0 \u00e9valuer la viabilit\u00e9 du Projet dans un d\u00e9lai bien d\u00e9termin\u00e9.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">A cet effet le groupe eranove souhaite engager un Bureau d\u2019Ing\u00e9nierie pour la r\u00e9alisation d\u2019un ensemble d\u2019\u00e9tudes pour \u00e9valuer la viabilit\u00e9 financi\u00e8re, environnementale, sociale et technique du Projet et si l\u2019ensemble de ces \u00e9tudes sont concluantes \u00e9ventuellement les \u00e9tudes d\u2019ex\u00e9cution et l\u2019assistance \u00e0 la maitrise d\u2019oeuvre.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">L\u2019ensemble des \u00e9tudes d\u2019\u00e9valuation de la viabilit\u00e9 comprend : (i) une \u00e9tude d\u2019avant-projet sommaire (APS), (ii) une \u00e9tude pr\u00e9liminaire d\u2019impact environnemental et social (EPIES), (iii) un business plan (BP). En cas de viabilit\u00e9 financi\u00e8re du Projet, les \u00e9tudes d\u2019avant-projet d\u00e9taill\u00e9 (APD), les plans d\u00e9taill\u00e9s d\u2019ex\u00e9cution et les dossiers d\u2019appel d\u2019offre (DAO) seront ajout\u00e9s \u00e0 la prestation du Bureau d\u2019Ing\u00e9nierie ainsi que l\u2019assistance \u00e0 la maitrise d\u2019oeuvre du Projet.<\/span><br \/>\n<span style=\"font-size: 10pt;\">Le groupe eranove invite les Bureaux d\u2019Ing\u00e9nierie poss\u00e9dant les qualifications requises et l\u2019exp\u00e9rience pertinente pour ex\u00e9cuter l\u2019ensemble des prestations ci-dessus d\u00e9crites, \u00e0<\/span><br \/>\n<span style=\"font-size: 10pt;\">manifester leur int\u00e9r\u00eat. Les Bureaux d\u2019Ing\u00e9nierie int\u00e9ress\u00e9s sont invit\u00e9s \u00e0 soumettre une manifestation d\u2019int\u00e9r\u00eat d\u00e9taill\u00e9 en Anglais et en fran\u00e7ais comme suit :<\/span><\/p>\n<ul>\n<li><span style=\"font-size: 10pt;\">i. Une br\u00e8ve description des activit\u00e9s du Bureau d\u2019Ing\u00e9nierie et son exp\u00e9rience g\u00e9n\u00e9rale dans le domaine des \u00e9tudes et de la maitrise d\u2019oeuvre du secteur de l\u2019\u00e9nergie ;<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">ii. Une br\u00e8ve description de l\u2019exp\u00e9rience du Bureau d\u2019Ing\u00e9nierie dans le domaine de l\u2019am\u00e9nagement hydro\u00e9lectrique. Une exp\u00e9rience sur le continent Africain serait un plus ;<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">iii. Les projets de r\u00e9f\u00e9rence pertinents dans le domaine des \u00e9tudes et de la maitrise d\u2019oeuvre pour des am\u00e9nagements hydro\u00e9lectriques.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-size: 10pt;\">La manifestation d\u2019int\u00e9r\u00eat ne doit pas d\u00e9passer 15 pages.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Un appel d\u2019offres d\u00e9finissant (i) le projet de contrat, (ii) les termes de r\u00e9f\u00e9rence (TDR), (iii) les crit\u00e8res d\u2019\u00e9valuation des offres, ainsi que (iv) les instructions pour les candidats \u00e0 pr\u00e9senter des propositions techniques et financi\u00e8res, sera lanc\u00e9 dans une phase ult\u00e9rieure, pour les Bureaux d\u2019Ing\u00e9nierie pr\u00e9s\u00e9lectionn\u00e9s \u00e0 l\u2019issue de cet appel \u00e0 manifestation d\u2019int\u00e9r\u00eat.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Les manifestations d\u2019int\u00e9r\u00eat \u00e9crites doivent \u00eatre fournies par courrier \u00e9lectronique (email) au plus tard le 20 Juin 2014 \u00e0 l\u2019adresse : ProjetCavaly@eranove.com<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Pour tout renseignement compl\u00e9mentaire, pri\u00e8re de contacter:<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Mr Zahalo SILUE<\/span><br \/>\n<span style=\"font-size: 10pt;\">Directeur de projets<\/span><br \/>\n<span style=\"font-size: 10pt;\">eranove<\/span><br \/>\n<span style=\"font-size: 10pt;\">T\u00e9l : +225 20 25 00 78\/79<\/span><br \/>\n<span style=\"font-size: 10pt;\">Portable : +225 06 53 31 83<\/span><br \/>\n<span style=\"font-size: 10pt;\">Email : zsilue@eranove.com<\/span><br \/>\n<span style=\"font-size: 10pt;\">Fax : +225 20 33 86 51<\/span><\/p>\n<p><!--:--><!--:en--><\/p>\n<p class=\"lead\">INVITATION FOR EXPRSSIONS OF INTEREST<br \/>\nProject evaluation studies (PD \u2013 ESI \u2013 BP \u2013 DD)<\/p>\n<p><span style=\"font-size: 10pt;\">C\u00f4te d&#8217;Ivoire is back among the countries providing economic leadership of the ECOWAS region (Economic Community of West African States). The politic appeasement and economic growth which is approaching a rate of 10% since 2012 have resulted in a return of more investors than before and an increase in the demand for electricity (over 15 %).<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">In addition, the Ivorian authorities show their willingness to make C\u00f4te d&#8217;Ivoire a power generation self-sufficient country and a net exporter of electricity, thus becoming a key player in the future regional electricity network. For this aim, C\u00f4te d\u2019Ivoire began to develop its hydropower potential. Therefore, on the 19th of March 2014 , The State of C\u00f4te d&#8217;Ivoire and eranove Group signed a Memorandum of Understanding (the &#8221; MoU &#8220;) for a BOO (Build Own Operate) contract for the design, financing, construction and operation of two hydroelectric plants located at Tiboto and Tahibli sites (&#8220;the Project&#8221;) on the Cavally river.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">eranove group whose majority shareholder is ECP (Emerging Capital Partners) is a major player in utilities management and power generation in West Africa. eranove group operates through its subsidiaries, a power generation fleet of 604 MW from hydroelectric plants and 532 MW from thermal power plants including 432 MW through its subsidiary CIPREL (Compagnie Ivoirienne de Production d\u2019Electricit\u00e9) which is the first Independent Power Producer (IPP) in C\u00f4te d&#8217; Ivoire.<\/span><br \/>\n<span style=\"font-size: 10pt;\">With the signing of the MoU, eranove group wants to increase the capacity of its fleet of hydropower by including the future hydroelectric plant located at Tiboto whose capacity is estimated at 225 MW and the other one located at Tahibli whose capacity is estimated at 19.5 MW. Both sites are on the Cavally River in western C\u00f4te d&#8217;Ivoire. eranove group is committed to assess the viability of the Project in a given time.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">To this end, eranove group wants to hire an Engineering firm for the implementation of a series of studies to assess the social, environmental, technical and financial viability of the Project, and if the Project is viable, implementation studies and assistance in project supervision will also be assigned to this Engineering firm.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">The viability assessing studies include: (i) a preliminary design, (ii) a preliminary study of environmental and social impact, (iii) a business plan (BP). In case of financial viability of the Project, implementation studies include: (iv) detailed design, (v) bidding documents and (vi) assistance in project supervision.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">eranove\u00a0group now invites Engineering firms with required qualifications and relevant experience to indicate their interest in implementing the studies described above. Interested parties are invited to submit an expression of interest (EOI) in English and French detailing the following:<\/span><\/p>\n<ul>\n<li><span style=\"font-size: 10pt;\">i. Short description of the Engineering firm\u2019s activities and general experience in designing and project supervision in the power sector;<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">ii. Short description of the Engineering firm\u2019s experience in hydropower development field. Experience on the African continent would be a plus;<\/span><\/li>\n<li><span style=\"font-size: 10pt;\">iii. Relevant reference projects of the Engineering firm in designing and project supervision of hydropower<\/span><\/li>\n<\/ul>\n<p><span style=\"font-size: 10pt;\">EOI should not exceed 15 pages<\/span><br \/>\n<span style=\"font-size: 10pt;\">A request for proposal which sets out (i) the draft contract, (ii) the terms of reference (TOR), (iii) the bid evaluation criteria, and (iv) instructions for bidders to submit their technical and financial proposals, will be made available at a later stage.<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">Written Expressions of Interest should be delivered by email to the address below, by June 20, 2014: ProjetCavaly@eranove.com<\/span><\/p>\n<p><span style=\"font-size: 10pt;\">For more information, please contact:<\/span><br \/>\n<span style=\"font-size: 10pt;\">Mr Zahalo SILUE<\/span><br \/>\n<span style=\"font-size: 10pt;\">Directeur de projets<\/span><br \/>\n<span style=\"font-size: 10pt;\">eranove<\/span><br \/>\n<span style=\"font-size: 10pt;\">T\u00e9l : +225 20 25 00 78\/79<\/span><br \/>\n<span style=\"font-size: 10pt;\">Portable : +225 06 53 31 83<\/span><br \/>\n<span style=\"font-size: 10pt;\">Email : zsilue@eranove.com<\/span><br \/>\n<span style=\"font-size: 10pt;\">Fax : +225 20 33 86 51<\/span><\/p>\n<p><!--:--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>AVIS D\u2019APPEL A MANIFESTATION D\u2019INTERET Etudes d\u2019\u00e9valuation de Projet (APS \u2013 IES \u2013 BP \u2013 APD) La C\u00f4te d\u2019Ivoire a retrouv\u00e9 sa place parmi les pays assurant le leadership \u00e9conomique de la r\u00e9gion CEDEAO (Communaut\u00e9 Economique des Etats de l\u2019Afrique [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[69,70],"tags":[],"class_list":["post-4612","post","type-post","status-publish","format-standard","hentry","category-cavally-en","category-non-classe-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/posts\/4612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/comments?post=4612"}],"version-history":[{"count":1,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/posts\/4612\/revisions"}],"predecessor-version":[{"id":4614,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/posts\/4612\/revisions\/4614"}],"wp:attachment":[{"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/media?parent=4612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/categories?post=4612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eranove.com\/en\/wp-json\/wp\/v2\/tags?post=4612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}